March 2007

Hull City build - Pedestrian Moving Bridge

Qualter Hall entered a design competition in 2006 for a 'new concept' pedestrian bridge for Hull Citybuild who wished to develop and regenerate the city’s Eastern Banks.

Following design and project proposal, public opinion of the people of Hull, and after numerous bid stages and presentations the company was awarded the contract in March 2007.

The contract is in 2 phases, phase one being to finalise all the design concepts and integrity of the superstructure and mechanical and electrical equipment, and phase two being to manufacture, install and commission the bridge.

A key feature in the award was the distinct form which the bridge takes, which makes the bridge an instant landmark unique to Hull and its rich maritime heritage.

The primary structure consists of a steel section cantilevering approximately 40 metres from a 3-dimensional vierendeel girder ring approximately 16 metres in diameter.

The structure is supported by a rotating mechanism which rests on a steel ring beam.

14th March 2006

Hugh Smith

The company is pleased to announce the acquisition of Hugh Smith Engineering.

Hugh Smith Engineering will be operated as a separate division of the company, and will offer new markets and customers, increasing the portfolio of Qualter Hall & Co Limited.

Hugh Smith Engineering us a world-renowned and well respected name for quality and reliability of its range of equipment which comprises:

  • Vertical Plate Bending Machines
  • Plate Edge Planning and Milling Machines
  • Shipyard Roll Presses and Flanging Presses
  • Ships Frame Bending Machines
  • Hydro Level Plate Levelling Machines
  • Presses comprising of Ring Frame, Gap, Horizontal and Punching
  • Spares and servicing for all of the above

www.hughsmith.co.uk