Skip and cage shaft headgears | Harworth
Fast Track headgear change | Harworth
click to enlarge

The work content included:-

  • Uprating the existing 9 tonne capacity system to accept 2 x 27.5 tonne balance skips
  • The construction of an underground loading station
  • The construction of a 450 tonne surface headgear tower in structural steel to sit within a concrete outer building
  • A surface skip discharge station
  • All surface inner tower equipment
  • All through shaft systems including rope guides, winch ropes, shaft signals, interlocks, skips and skip plant controls.

 Client: British Coal