Swing Bridge | Fretherne
click to enlarge

This work included:

  • Incorporate BWW structural design within a buildable proposal. Design and detailing of fabricated bridge sections, and all associated slew gear and control systems.
  • Fabricate, trial assemble and calibrate bridge deck
  • Complete drive and control systems.
  • Install all equipment onsite, onto new civil foundations, within very restricted site environment.

Client: British Waterways - Morrison