Swing Bridge | Fretherne
click to enlarge
This work included:
- Incorporate BWW structural design within a buildable proposal. Design and detailing of fabricated bridge sections, and all associated slew gear and control systems.
- Fabricate, trial assemble and calibrate bridge deck
- Complete drive and control systems.
- Install all equipment onsite, onto new civil foundations, within very restricted site environment.
Client: British Waterways - Morrison

